/images/store/157/11-Level-Construction-Supply.jpg/images/store/157/12-Level-Construction-Supply-.jpg/images/store/157/13-Level-Construction-Supply.jpg
/images/store/157/21-Level-Construction-Supply.jpg/images/store/157/22-Level-Construction-Supply.jpg/images/store/157/23-Level-Construction-Sypply.jpg
/images/store/157/31-Level-Construction-Supply.jpg/images/store/157/32-Level-Construction-Supply.jpg/images/store/157/33-Level-Construction-Supply.jpg
/images/store/157/41-Level-Construction-Supply.jpg/images/store/157/42-Level-Construction-Supply-2.jpg/images/store/157/44-Level-Construction-Supply-11.jpg
 
BROWSE CATEGORIES
 

Search:

Bridges

B-003

Alabama Metal Industries

  • Contractors frequently use Stay-Form on bridge projects to form footings, edge forms and bulkheads. When building a cast-in-place segmental box girder bridge, forming the bulkheads has signi?cant labor savings because the bulkhead does not have to be striped.
  • (click image to enlarge)
    Quick Overview
    • Test reports prove that when forming a bulkhead, Stay-Form provides 21% greater shear bond strength to concrete than does plywood.

    • Unlike plywood-formed bulkheads, Stay-Form bulkheads do not require scabbling of the concrete. This means additional labor savings.
    Interested in this item or want more information?

    Phone:
    Email: Sales@48ws.com

    Can't find what you want? Give us a call and we can help you find it.
    Additional Information
    Manufacturer: Alabama Metal Industries
     
    Search:
    Facebook GooglePlus LinkedIn StumbleUpon Twitter YouTube
     
    Copyright © 2020 48ws.com.
     
    Powered by 48ws.com